A colleague at work painted the seat rail in primer.
After the paint dried I started with the dismounting of the jigs from the door. The seat rail was then laid in place and positioned. I drew the outline with a scribe and sanded the paint frome that location on the floor.
Next I drilled the holes in the rail for welding.
The boxes for the under side of the rail are also sanded and drilled.
With clamps the seat rail was then positioned in place
The holes for welding are drilled trough the floor and on the underside the paint was removed where the boxes will be fitted.
So next the boxes are positioned under the floor and and everything is tied down with some long bolts trough the mounting holes for the seats.
Tomorrow I will close the last gaps and then it will be welded in place.
No comments:
Post a Comment